Project background: A medium-sized city's water supply plant is facing the problem of insufficient water supply pressure, low efficiency of old water pumps, and high energy consumption.
Solution:
Replace the original equipment with an efficient centrifugal pump (flow rate of 800m ³/h, head of 60m)
Install an intelligent frequency conversion control system to automatically adjust according to water demand
Optimize pipeline layout to reduce hydraulic losses
Project achievements:
Water supply pressure increased by 35%, covering an additional 30000 users
Reduce energy consumption by 28% and save approximately ¥ 1.5 million in annual electricity bills
The degree of system automation has been improved, reducing manual intervention